
Every week someone complains that the meeting room is stuffy, the building's electricity bill keeps rising without explanation, and the night guard reports air conditioning and lights still on across several floors at ten in the evening. The building manager knows something is wasteful but has no data to point at it.
"Smart building" is the answer often offered, yet it tends to sound like a huge project that replaces every system in the building. So, what is a smart building in practical terms? This article covers the definition, the components, the benefits a building manager can realistically expect, and how to start from the equipment already in place.
What is a smart building?
Put simply, a smart building is one whose conditions and energy use are read continuously by sensors and meters, gathered on one platform, and used to make decisions or run automation. Air conditioning, lighting, ventilation, and pumps are no longer run on fixed schedules and guesswork, but on actual conditions: how many people are in a room, how fresh the air is, and how many kWh are being used.
Indonesia's formal term is Bangunan Gedung Cerdas (BGC, smart building), set out in Minister of Public Works and Housing Regulation No. 10 of 2023. It defines a BGC as a green building that applies a smart building management system, guided by nine principles that include working automatically, being connected and integrated, integrated energy management, protection against cyber threats, data analytics, and continuous monitoring. Formal BGC status has its own technical standards, assessment, and certification. In everyday use, "smart building" is used more loosely for any building that has started to be managed with data.
Smart building, BMS, and an ordinary building
A BMS (building management system) is an automation system that monitors and controls a building's mechanical and electrical systems in an integrated way, such as chillers and air handling units. A BMS can be part of a smart building, but the two are not the same.
| Aspect | Conventional building | Building with a BMS | Smart building |
|---|---|---|---|
| Focus | Equipment runs to a timetable | Control of HVAC and utilities | Cross-system data for decisions and automation |
| Energy data | The monthly bill | Usually limited to controlled equipment | Per load, per zone, per floor |
| Room conditions | From occupant complaints | Temperature at certain points | Temperature, humidity, CO2, and occupancy per room |
| Who sees it | Technicians on rounds | Operators in the control room | Managers, technicians, and leadership, from anywhere |
Many offices, schools, and factory buildings in Indonesia run split air conditioners and ordinary electrical panels with no BMS at all. For them, the road to a smart building is actually simpler: add sensors and meters rather than replace control systems.
Smart building components
- Room sensors: temperature, humidity, CO2, fine particles (PM2.5), and occupancy (whether anyone is there).
- Energy meters per load: air conditioning, lighting, pumps, lifts, and other large loads measured separately, not just the main utility meter. The principle is the same as electrical submetering.
- Controllers and actuators: contactors, relays, or AC controls that can run schedules and automatic commands.
- Connectivity: a gateway for Modbus devices already installed, plus Wi-Fi, LoRa, or cellular where cabling is hard.
- A platform: dashboards, alarms, reports, and automation rules in one place.
- People and procedures: who receives alarms, who acts on them, and when the data is reviewed.
The regulation itself lists sixteen BGC elements that must be integrated into the BMS, from electrical, lighting, air conditioning, and ventilation through drinking water, wastewater, CCTV, access control, in-building transport, and parking. Almost no building starts with all sixteen at once.
Realistic benefits for building managers
- After-hours waste becomes visible. Air conditioning and lights left on at night and at weekends show up in the building load profile. As an illustration, one floor with 15 kW of AC and lighting left on for 3 hours every working night wastes 45 kWh a night, or about 990 kWh over 22 working days.
- AC in empty rooms gets caught. Occupancy and energy data per room reveal meeting rooms being cooled with nobody in them.
- Comfort complaints get answered with data. Temperature and CO2 per room show whether a room really is too cold or stuffy, and at what time. Indoor CO2 limits are covered in our article on indoor CO2 levels.
- Space use is measured. Rarely used meeting rooms and always-full floors show up in occupancy data, which helps when reorganising space.
- Equipment faults surface sooner. A pump that never stops or an AC unit whose energy jumps raises an alarm before anyone complains.
Data does not save energy on its own. Savings come from the actions taken on it, such as schedules, setpoints, and maintenance. The steps for air conditioning are in saving energy on office building AC.
How to start from existing equipment
- Pick one problem that hurts most: the electricity bill, comfort complaints, or after-hours use.
- Take stock of what exists. Is there a BMS, digital power meters with Modbus, or separate panels per floor? Anything that can already be read does not need replacing.
- Meter the main loads, such as the AC and lighting panels on each floor.
- Put sensors in representative rooms: meeting rooms, open-plan areas, and the rooms people complain about most.
- Set operating hours and thresholds, then turn on alarms for after-hours use and rooms outside their range.
- Review for four to eight weeks, prove the impact, then add automation and extend to other floors.
Things to keep in mind
- Integrating an older BMS needs protocol access and permission from whoever maintains it. Ask early.
- Occupant privacy. Occupancy sensors only need to detect whether someone is present, not who. Explain this to occupants.
- Network security. Keep building devices on a network separate from office IT, and limit who can access the platform.
- Automate last. Turn automation on only once the data has proven reliable, so AC does not switch off in a room that is actually in use.
Frequently asked questions
Does a smart building need a BMS?
No. A building without a BMS can start with energy meters and room sensors connected to a platform. A building that has one can add data from it when protocol access is available.
What is the difference between a smart building and a green building?
Under the same regulation, a green building is one with measurable performance in saving energy, water, and other resources, while a smart building is a green building that adds a smart building management system. In practice, smart building data helps prove that green performance.
Can an older building become a smart building?
Yes, step by step. The first step is almost always monitoring, which leaves existing control systems untouched.
Smart buildings with INCLUDE
InBuilding calculates two things from real data: the electricity used by air conditioning and lighting outside working hours, and room comfort from temperature, humidity, CO2, PM2.5, and occupancy. It finds air conditioning running in empty rooms with an estimate of the kWh wasted, shows the building load profile and energy per zone, and analyses space use and high-CO2 hours. Each load is measured by its own energy meter (the single-phase or three-phase IncludeBox Energy Meter). InBuilding is available from the Pro plan, and its alarms can be forwarded to Telegram.
Power meters and Modbus RTU devices already in the building can still be connected to the INCLUDE platform through IncludeGateways, so the first step does not have to start with buying all new hardware.
Building electricity bill rising with no clear cause?
Tell us how many floors you have, the type of air conditioning, and the meters already installed. The INCLUDE team will help choose the first measuring points for InBuilding.
Free consultation on WhatsApp → See InBuilding →